Earth work in hard soil for lowering the ground and also strengthening the foundation carefully without causing any damage to the structure and disposing of the excavated stuff beyond the temple surrounding and finished neatly. Earth work excavation in hard soil for strengthening the foundation by scooping the earth below the structure, by providing proper props of coco palms of any other suitable size poles both inside as well as outside executed bit by bit carefully and disposing of the excavated stuff beyond the temple and finished neatly. Laying 1:4 cement concrete in the foundation using 40 to 50 mm size granite metal, well mixed and consolidated and finished neatly. Construction of size stone masonry in 1:6cm using full size bonds for the entire construction neatly packed, without giving any gap in the scooped out space and finished neatly.

Scraping of picking the top surface of terrace carefully to a depth of 20mm to 30mm without damaging the weatherproof course and neatly brushed with wire brush and plastered with 1:1:6 combination mortar 20 mm thick mixed with crude oil / water proofing material and jiggery water and toned to match the shikara including curing etc. complete. Repairing the existing temple door shutters by providing fresh N.W scanting to the door shutters and bringing the appearance of temple type door shutters, providing suitable floral creeper designs on the scantling as well as in pillars and finished neatly including two coats of grey paint completed. Providing and fixing temple type door shutters to the openings in n.w. place of 3" entrance and scantlings of 3"x 5" size with all fixtures including 2 coats of painting etc. completed.

Dismantling the existing rough stone flooring from the position duly numbering, re-laid as per original position over a sand cushion 3" thick, by attending 2 live dressing for top surface and side are usually trimmed and joints sunk painted and toned and finished neatly. Repairs to Shikara and niches Repairs to the temple brick shikara over garbhagriha measuring 10'-0"x10'-0"x15'-0" in three tiers containing highly ornamented stucco figures Karna Kutas shikaras floral design and various birds in progreation and recess spaces in each tiers after remaining the old decayed plaster by using very delicate tools, without altering of disfiguring the original features, and strengthening the shikara by introducing first quality special type bricks in 1:4 cm wherever it called for mending of broken missing parts of figures and plastering exposed surfaces.

Similarly attending the same process to the parapet niches existing al-round terrace containing of various patterns with Simha lalata in between niches available Kurtas and Karnas including mending the damaged work as per original pattern including plastering surface with 1:4 cm 0.5 thick and over its application of very thin layer of final coat in Lime paste prepared by mixing marble powder, jiggery including erection of scaffolding curing and removal of scaffolding etc. completed. Construction of Mantapa (beyond Mahadwara) Excavation in hard soil for providing foundation to the pillars and disposing off the excavated stuff beyond temple surrounding and finished neatly. Laying 1:4:8 cement concrete in foundation using 40 to 50 mm granite metal well mixed and consolidated and finished neatly.

Construction of size stone masonry in 1:6 cm using good quality stone with proper bonds and finished neatly. Supplying and erection of base 2'- 0"x 2'- 0" x 1'- 0" finished size neatly 2 lime dressed, fixed in position. Supplying and fixing stone pillars finished size of 1'-6"x 1'-6" x 6'-9" with cutting octagonal shape of 1'-0" to 1'-3" height at 2 places in each pillar and finished as per direction. Supplying and fixing 3'-0"x 1'-0"x 1'-0" capital neatly 2 lime dressed and chamfering the ends of capital bottoms to a height of 6" and finished. Supplying and fixing beams of finished size 1'-0"x 1'-0"x 7'-6" with lime dressed, finished all the side faces and top face only one time dressed including fixing in position.

Laying of roof slabs in front of mantapa using 6" thick slab dressed and fixed in position by cutting edges below the niches containing stucco figures without causing any damage and including trimming the edges neatly. Constructing parapet around the newly laid terrace with first class brick in 1:6 cm and finished neatly. Laying weather proof over the evenly laid slabs to an average of 15 cm thick, using 1 lime and 3 brick bats well consolidated and plastered with combination mortar 20 mm thick and finished neatly. Plastering the parapet with 1:6 cm, 20 mm thick and finished neatly. Laying the stone pavement using 3" thick slab over a sand cushion of 3" thick with curb stone al-round without dressing for slab, sides are neatly trimmed and joints sunk pointed with 1:4 cm and toned and finished neatly.


 

 