| Strengthening the foundation by providing cement concrete under-pinning and grouting in
cement liquid mortar etc.
Earth work excavation
Providing and laying cement concrete 1:3:6
Under pinning the foundation by constructing rubble masonry using boulders in cement mortar
Grouting the joints of the plinth and facade of the temple in cement liquid mortar
Repairs to the shikara and damaged stucco figures and decorative pilaster mouldings etc.
by removing dead and decayed plaster and strengthening them by grouting, filleting, filling the
voids including making good of missing bricks in lime mortar 1:2, and adding 20% white cement,
finished with suitable colour including introducing reinforcement where-ever found necessary
Removing red oxide flooring and providing and fixing stone slabs of 10cms (2 line dressing)
including recess pointing etc. complete in all respects.
Repairs to pillars, capitals and other components which are slightly disturbed and displaced by
grouting in cement liquid mortar 1:2 to the joints including recess pointing etc.
Providing and fixing teak wood door leaves 50 mm thick including brass fixtures complete in all
respects (design should be obtained as per doors of similar pattern).
Providing and fixing flag stones alround the temple to prevent seepage of water on sand bed
of 10cm including recess pointing etc. complete in all respects. Chiseling and dressing stone flooring of Sabha Mantapa (4 line dressing) which is uneven to
give neat appearance to the flooring.
Chemical cleaning for removing soot and other oil smeared surfaces.
|