Major Structural Repairs

1.The entire temple structure both inside and outside should be cleaned, which are filled with all sorts of things and washed thoroughly with water (not to use Chemicals) and keep it neat.
2.The interior portion of Navaranga and Sukanari to be cleaned, and made fit for function.
3.The central lathe turned pillars are to be toned up with suitable colour.
4.Walls to be washed with water. Door shutters to be painted.
5.The outer face of temple, which is covered with cobweb mud, should thoroughly be cleaned. Wider joints if any, have to be filled. The jagati pavement pointing wherever necessary should be attended.
6.The entire courtyard to the south of temple should be kept neat and tidy for the purpose of 24 hours water.
7.The vegetation growth should be removed.
8.The present parapet has to be provided with Merlin type decoration. The Nandi should be provided at 4 corners.
9.Strengthening the broken beams in the Navaranga.
10.Exposing the hidden basement moulding alround the temple.
11.Water tightening the terrace as well as Shikara.
12.Arrangement has to be done for video and photographs.

 


 

 